Pearson Engineering is engaged in a five-year opportunity to apply basic functional testing and commissioning at this medical facility. That process includes:
(1) Thorough documentation of the Design Intent, operating sequences, and test procedures.
(2) Peer review during design, with emphasis on constructability, ease of maintenance, and adherence to the Design Intent.
(3) Verification of system performance based on extensive functional testing and measurement.
(4) Proper training of building operations staff on system operation and maintenance procedures.
(5) Ongoing monitoring of system performance.