Mazomanie and Cross Plains, Wisconsin

A client since 1991, Plastic Ingenuity has retained Pearson Engineering to assist with projects throughout their facilities.

We have established redundancy in the condenser water systems, improved winter operations, evaluated comfort and process chilled water systems to cool their thermo-forming process, made recommendations to improve system performance, and designed a heat recovery system to capture energy from large air compressors and then use that heat in the warehouse.